Concrete Mix designs for M15,M20,M25,M30 and M35

Answer Posted / sadam

m-15 1:2:4,m-20 1:1.5:3

Is This Answer Correct ?    362 Yes 68 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the latest method to detect a crack in a building?

678


can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??

1798


what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15

2509


i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??

1642


During reclamation how can the occurrence of mud waves can be rectified?

824






What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2234


Define What materials were used to build the Golden Gate Bridge?

641


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1659


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1409


what are the five benefits of using standard terminology in the measurement process?

1666


How to do base isolation for RC framed structure using ETABS software?

3742


what is total volume of ingredients used in concrete accordingly

1806


How do you calculate the power of centrifugal pump?

647


What is Refuse Area In High Rise Building ?

1495


how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.

2145