Answer / sjtbehera
Ratio is cement mortar = 1:5 Thickness of plaster is 12mm
Let's calculate 1 sqm
volume of mortar= .012 x 1 = .012cum
Increase 20% for filling joints and wastage = .012x1/5
= .0144cum
when dry calculate volume of moratr by increasing 30%
= .0144+1/3x.0144= .0192 cfum ( dry)
total ratio = 1+5=6
.0192/6= .0032cum cement 1bag cement=.0347cum
so when we calculate 1 bag of cement total area cover-
1/.0032x.0347= 10.84 sqm
| Is This Answer Correct ? | 163 Yes | 28 No |
Answer / divagar
1:5 ratio for 50kG cement, 50*5kG SAND
10SqM FOR -0.014CUM CEMENT ARE USED
SO 1440/5=288
288/50=5.76
5.76/0.014=411.28
411.28/35.314=11.65
SO : 11.65 Sqm
| Is This Answer Correct ? | 35 Yes | 5 No |
Answer / ketan khetia
For 12mm thick plaster cement consumption = 0.5kg/sq.ft
so in one bag = 50kg we get 100sq.ft plaster=9.29sq.mtr
| Is This Answer Correct ? | 33 Yes | 15 No |
Answer / manimaran>g
100sqfReq.cement=0.75bags
so, o75bags=37.5kg
1kgcovered plaster area=100/37.5
=2.666667*50
=133.33sq.ft
=133.33/10.76
=12.39sq.m
so,one covered plaster area=12.39sq.m
| Is This Answer Correct ? | 20 Yes | 9 No |
Answer / ravendra kumar thakurela
1BAG CEMENT = 11.00 SQM PLASTER 12MM THK CM 1:5
| Is This Answer Correct ? | 15 Yes | 4 No |
Answer / mohammed aijaz hussain
For 1 sq.m plastering in CM (1:5) with 12 mm thickness,
cement required is 4 kg.
Therefore, in 1 bag (50 kg.) of cement one can do plastering
for an area of 50/4 = 12.5 sq.m.
| Is This Answer Correct ? | 21 Yes | 13 No |
Answer / elavarasan.es
1440/5=288
12mm=0.012
288 *0.012=3.45kg per 1 square m
50kg = 14.49 square meters coverage
155 .912 square feet
| Is This Answer Correct ? | 0 Yes | 0 No |
How to cal. The weight of hollow pipe?
how many bricks are requir for one unit ho we will caculate
among the strectcher, header, english and flemish bond which has greater strength? where these bonds are preferred?????
What is the difference between stress and pressure
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
What is the difference between opc cement to ferro cement
binding wire requirement in rcc structures
WHAT IS THE MELTING POINT OF STEEL?
how many blocks will come per 1 meeter squear
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
what is the types of surveying?which type of survey carrying for type of work?
How can i calculate the amount cement, steel , sand nd aggregate reguired for 1000 sq ft of r.c.c?
2 Answers Agrawal Construction,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)