Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) how to calculate the multiplication factor in HT incomer trivector meters
Dalkia, Getco, Gujarat Energy Transmission Corporation Limited GETCO,
9 73383HOW DO I CALCULATE OVER LOAD RELAY & CONTACTOR IN DOL STARTER? & in dol why it is require circuit breaker?
DLF,
6 22080what are the different pre- commissioning tests performed on distribution transformer, power cable and switchgear?????
1 5646what is V.L.F. testing of power cable? do you know the voltage ratings, like for what rating and size of cable what rating of V.L.F. testing is used?
2357
HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.
Installation method of self treated earth electrode.
In an ACB shunt trip coil and undervoltage coil operated normally( breaker open and charged). But closing coil not operating untill manually discharge and recharging. Any help.
Why you are switching off arc protection mcb when you are taking shutdown for lv board.
what is per unit calculation?looking for simple and strong explanation thk u
can anybody give me syallbus of chemical engineering for section engineer in railway.
1 TO 65
What are the steps taken to operate a tank-blanketing valve?
diff b/w elcb and rccb
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
what is ground fault in ACB?
How much kv gas generator is needed to run 2 hp and 1 hp airconditioners, plus a refrigerator and 4 Tvs
anybody, Please send me the NIC(scientific officer/programmer) model questions papers to this mail id:imtiyazahamed14@gmail.com
im an electronics and communication engineering..i have to attend an interview based on contract basis.i kindly request u to send all possible questions to my mail. MY EMAIL ID IS -ashishkashyap931@gmail.com