What is meant by Anchorage length? Development Length?




Answers were Sorted based on User's Feedback



What is meant by Anchorage length? Development Length?..

Answer / sjtbehera

Development length is the length overlap of bars tied to
extend the reinforcement length. is about 50 times the dia
of bar is consider to safe.

Anchorage length- this is the additional length of bar
recquired ti insert in another at the junction. For example-
Main bar of the beam in column at beam column junction.
this length is simiilar to the lap length.

Is This Answer Correct ?    139 Yes 90 No

What is meant by Anchorage length? Development Length?..

Answer / v.purushotham

Development Length : Is a length of bar or
reinforcement rod is required to transfer the load to
another bar safely and not affecting to the member which is
in it. 49 times of bar is compression and 46 times is in
tension. But in construction 50 times takes of bar diameter.
Anchorage Length : Required distance to transfer
load and which is depends up on member competence i.e. type
of materials used and bearing strength and type of grout
which is in it.

Is This Answer Correct ?    70 Yes 37 No

What is meant by Anchorage length? Development Length?..

Answer / alehegn yehuala

Basically the development length is the length which should
be such that the stress should develop on both sides of the
point of maximum stress in the steel bar. If this point is
in the mid span of the beam then it can develop on both
sides but if the maximum stress is at the end (like in
cantilever) then we need to provide extra length beyond the
end support center line. If this extra anchoring length is
straight which is not beyond the nominal cover of the end
support then its same as development length and if this
extra anchoring is beyond the nominal cover of the end
support, then it is not straight bar i.e. with hooks then it
is called as anchorage length which is used to provide full
development length & an additional length for stability of
the structure.Therefore it is the anchorage length must
provide to detail any structure which have the same
situation as described in the above rather than development
length.

Is This Answer Correct ?    29 Yes 6 No




What is meant by Anchorage length? Development Length?..

Answer / arun chauhan

development length is the length embedded in concrete to attain full strength.

Is This Answer Correct ?    16 Yes 4 No

What is meant by Anchorage length? Development Length?..

Answer / karthick

Anchorage length of the cnatilever beam is 69d.

Is This Answer Correct ?    6 Yes 5 No

What is meant by Anchorage length? Development Length?..

Answer / manish

This is the additional length of steel of one structure required to be inserted in other at the junction. For example, main bars of beam in column at beam column junction, column bars in footing etc.

Is This Answer Correct ?    14 Yes 15 No

What is meant by Anchorage length? Development Length?..

Answer / tang eng kee

#1,#2,#3

Is This Answer Correct ?    2 Yes 7 No

What is meant by Anchorage length? Development Length?..

Answer / saqlain momin

development length is the length of the bar which is overlapped over another bar when the length of the bar is short .

Is This Answer Correct ?    3 Yes 12 No

What is meant by Anchorage length? Development Length?..

Answer / trevis

anchorage lenght is the lenght of overlap of the bars into
each other the lenth is 45times into dia of bar

Is This Answer Correct ?    12 Yes 66 No

What is meant by Anchorage length? Development Length?..

Answer / s p sharma

What is meant by Anchorage length? Development Length?
Ans: Both are same.

Is This Answer Correct ?    17 Yes 92 No

Post New Answer



More Civil Engineering Interview Questions

how much steel required for 1 sq.m area?

12 Answers   L&T,


What are your future hopes for this job?

0 Answers   Jaycon,


where we use one way slab and two way slab?

7 Answers   SRM,


difference between high rise & multistoried building?

2 Answers  


1sqm=? wood

2 Answers   Nagarjuna Construction, Ackruti, SRS Group,






What are the different grades of concrete ?

3 Answers  


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

0 Answers  


what is step foundation

2 Answers  


While casting slab at what length slab casting should be stop

5 Answers  


what"s the purpose of dry lean concrete(DLC)and where it"ll be use it?

5 Answers   Jaypee,


procedure for preliminary selection of size of column of 5 storey building

0 Answers  


what is mean by eccentric footing?

3 Answers   Shiva Corporation,






Categories
  • Civil Engineering Interview Questions Civil Engineering (4636)
  • Mechanical Engineering Interview Questions Mechanical Engineering (3700)
  • Electrical Engineering Interview Questions Electrical Engineering (15765)
  • Electronics Communications Interview Questions Electronics Communications (2636)
  • Chemical Engineering Interview Questions Chemical Engineering (762)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (79)
  • Bio Engineering Interview Questions Bio Engineering (30)
  • Metallurgy Interview Questions Metallurgy (95)
  • Industrial Engineering Interview Questions Industrial Engineering (199)
  • Instrumentation Interview Questions Instrumentation (2879)
  • Automobile Engineering Interview Questions Automobile Engineering (171)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (41)
  • Marine Engineering Interview Questions Marine Engineering (62)
  • Power Plant Engineering Interview Questions Power Plant Engineering (169)
  • Engineering AllOther Interview Questions Engineering AllOther (1334)