what is the best method for analysing frames of
multistoreyed structures

Answers were Sorted based on User's Feedback



what is the best method for analysing frames of multistoreyed structures..

Answer / kaushik

i think 2 cycle moment distribution method(substitute frame method) is a good method for analysing framed structures. but it is tedious to calculate if the no. of frames r more.

Is This Answer Correct ?    4 Yes 1 No

what is the best method for analysing frames of multistoreyed structures..

Answer / saisush6

i feel kanis rotation analysis is quick and easy how you
opine if so what are the good text books for this analysis

Is This Answer Correct ?    4 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

according to the painting co efficient, we should take the one side of doors (or) windows or both sides?

1 Answers  


WILL ANY COLLEAGUE TELL ME THAT WATER RATIO IS FIXED FOR ANY TYPE OF CONCRETE? OR HOW CAN WE DETERMINE THE RATIO OF WATER IN A CONCRETE MIX.

3 Answers   FHA, Unitech,


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

0 Answers  


i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need

1 Answers  


How many cncrete grades are used for construction,explain with proportion,grades and where it used

4 Answers   Unicel,


Give me an example of a time when something you tried to accomplish and failed.

1 Answers  


how many cement in cubic feet of 40 kg bag white cement.

1 Answers   Mondol Group,


writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

1 Answers  


mean of NH4 pipe

1 Answers   GVK, L&T,


What is the life of reinforcement?

3 Answers  


What are the composition of a landfill?

1 Answers  


how to calculate quantities of sand , cement & aggregate in 1m3 - M20 , 1m2 of 6mm/12mm/20mm plaster , 1m3 20cm/ 1m2 of 10cm brick wall, paint quantity for 1m2 snowcem and lime painting?

3 Answers   DCPL, EverSun, Pace Power Systems, Sobha Developers,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)