Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the out turn of one masson in plastering, masonary
work in 8 hours, with limited healper?
what is the out turn of corpender in form work? wood work?
in 8 hour with limited healper?
what is the out turn of bar bendarin 8 hour with limited
healper for slabs, beams, coloumn?

Answers were Sorted based on User's Feedback



what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? ..

Answer / guest

10 SQM PER DAY ,1000 NOS DAY,

Is This Answer Correct ?    15 Yes 7 No

what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? ..

Answer / ravi

1)150to180Sft or14 to 16 Smt 2)formwork 600Sft of roof
shutering
or 112 Sft of plain door shutering
3)slab 1200Sft
beem 1.2 Ton
column 1.3 Ton

Is This Answer Correct ?    11 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

the plan area of a building 10*15 of superstructure 0.30 then plinth area is

1 Answers  


how to calculate steel quantity of column from steel design

1 Answers  


where you provide overlap on column?

10 Answers   ABB,


For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is

1 Answers  


what is the minimum cement content for rcc as per is code

4 Answers   JMC Projects,


Direct chairs over shutter / beside earth is prohibited because of ––

1 Answers  


How to convert sqft in cft

11 Answers   BEL,


how to calculate the strength rebound hammer test if average reading of 50.6,50.2,49.1,50.5,50.8,51.7 in grade M-60

1 Answers   L&T,


i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???

0 Answers   QRI,


Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?

7 Answers   UPSC,


what is the creep in concrete

4 Answers   L&T,


if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)