what is the out turn of one masson in plastering, masonary
work in 8 hours, with limited healper?
what is the out turn of corpender in form work? wood work?
in 8 hour with limited healper?
what is the out turn of bar bendarin 8 hour with limited
healper for slabs, beams, coloumn?
Answers were Sorted based on User's Feedback
Answer / ravi
1)150to180Sft or14 to 16 Smt 2)formwork 600Sft of roof
shutering
or 112 Sft of plain door shutering
3)slab 1200Sft
beem 1.2 Ton
column 1.3 Ton
Is This Answer Correct ? | 11 Yes | 7 No |
why we can use dust in concrete insted of fly ash
What is the difference between built area and super built up area?
What is different between DI Pipe and CI pipe?
i need the how much materials are needed for cubic feet of concrete?
if rise and tread of stairs rae 16 & 25cm with landing slab of thickness 100mm . If there are 8steps, and carpenter ask for to mark the bottom of centering of landing on column, what will be the height above floor finished level?
How to arrive dry volume of concrete (1.52 to 1.57) ?
How many required water of 1m3 Brick masonary and slab casting?
1 Answers Everest Bank, GVR, Vijay Nirman Company Pvt Ltd (VNC),
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
what is lap length? why it is required?
1)How to calculate concrete cube testing load by area in mpa 2) in kg/cme also
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
is basic cost of the material includes tax?