what is the out turn of one masson in plastering, masonary
work in 8 hours, with limited healper?
what is the out turn of corpender in form work? wood work?
in 8 hour with limited healper?
what is the out turn of bar bendarin 8 hour with limited
healper for slabs, beams, coloumn?
Answer Posted / ravi
1)150to180Sft or14 to 16 Smt 2)formwork 600Sft of roof
shutering
or 112 Sft of plain door shutering
3)slab 1200Sft
beem 1.2 Ton
column 1.3 Ton
| Is This Answer Correct ? | 11 Yes | 7 No |
Post New Answer View All Answers
How to make a c++ program that converts any base to base 10?
what is civil engineer greatest strength and weakness?
undistributed samples are obtained by
How can you achieve soil enforcement?
The concrete slump recommended for beams and slabs; is?
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
Define Who designed the city of Washington DC?
How to construct a water sump in a rocky soil?
Can we apply curing compound on ceiling (slab Bottom)
Define What is a kip?
What is a kip?
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
What is Refuse Area In High Rise Building ?
What is quantity of cement and sand required for 2000sqft of tiling?
What is labor and material payment bond?