What is meant by Anchorage length? Development Length?
Answer Posted / alehegn yehuala
Basically the development length is the length which should
be such that the stress should develop on both sides of the
point of maximum stress in the steel bar. If this point is
in the mid span of the beam then it can develop on both
sides but if the maximum stress is at the end (like in
cantilever) then we need to provide extra length beyond the
end support center line. If this extra anchoring length is
straight which is not beyond the nominal cover of the end
support then its same as development length and if this
extra anchoring is beyond the nominal cover of the end
support, then it is not straight bar i.e. with hooks then it
is called as anchorage length which is used to provide full
development length & an additional length for stability of
the structure.Therefore it is the anchorage length must
provide to detail any structure which have the same
situation as described in the above rather than development
length.
| Is This Answer Correct ? | 31 Yes | 6 No |
Post New Answer View All Answers
How about the temperature of grade 35A concrete? Does it depend on the ambient temperature?
How much is the cover for slab?
Why are the bolts that hold steel rails together in oval holes?
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
what is anchorage length,lap length and (dont remember the last one)
What is the significance of cost estimate knowledge for an architect?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Floor tile measurement? Wall to wall or skirting to skirting
How is make concrete cube?
what are the duties of Site Engineer in work site?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
how to remove the quantity of metal 1 and metal 2 in concrete