Answer Posted / akshaya
The least count of Theodalite survey is about
10 second to 20 second.
Least count is the difference of the samllest value of main
scale to vernier scale.
Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Explain the latest method to detect a crack in a building?
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
Describe the role of independent Quantity surveyor?
what are the layers of the national and heir aprox thickness??
Which is the direction for positive angle?
What is structural frames or systems?
Howmuch bend to be provide for 200/600 BEEM
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
sir how can we find the cement and sand required for making 4" drop
How to find the cuplock pipe qty in staging for Minor bridge?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?