Answer / ishaan
The electricity is generated and transmitted at the values
of multiples of 11 because the value of form factor is 1.1
for sinusoidal waves, we generally incoorporate sine wave,
cose wave for electrical signals and at this value of form
factor, the efficiency of any electrical equipment is
maximum. More precisely we would say these are the
multiples of 1.1 like 6.6 etc.
| Is This Answer Correct ? | 11 Yes | 2 No |
Answer / gunnam santosh
we get avg values by multipling formfactor 1.11 for ac
sinusoidal wave form, so that efficiency will be maximum
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / s.v.pratap
there is no technical reason behind it.from very olden days engineers used to generate and transmit at the values of multiples of 11, and now-a-days they are continuing that. thats all.
this is true. (director of genco (andhra pradesh) had told this in one of his lecture).
| Is This Answer Correct ? | 3 Yes | 5 No |
Whether earthmat designning is done only for sub station or it can be done for multy residential complexes also? What is the size, type & arrangement of the earth grid to be done?
In the UVR(Under Voltage Relay) there is a knob for the hysteresis setting. what is this setting? its threshold is given from 5% to 50%. please help me....
what is the need of representing AC power in sinusoidal waveform? why not in square or rectangular etc...
At what point crngo works like as crgo
Can somebody tell me the type and amp of transformer used to implement 600VA UPS? Thanks in advance.
what is the temperature rise test? explain in brief.with formula.
What is the use of insulation tester and how it is to be used.
Is an SCR semi controlled device?
why any normal motor have to provide star & delta winding distribution during starting?
what is relation of rpm with Power supply? rpm directly Proposational to power ?
How can we estimate Gen rotor current?
After fault clearing in Tr line, whether the Metering core of CT is comes to normal condition from saturation region & its works as a normal condition?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)