What is BEP? How is it calculated?
Answers were Sorted based on User's Feedback
Answer / shivan
BEP=break even point.....
and formula.... fixed cost
----------X100
p/v ratio
In economics, specifically cost accounting, the break-even
point (BEP) is the point at which cost or expenses and
revenue are equal: there is no net loss or gain, and one
has "broken even". Therefore has not made a profit or a loss
| Is This Answer Correct ? | 129 Yes | 19 No |
Answer / rajender yadav
formula is same as above
BREAK EVEN POINT ON SALES - IT IS A POINT WHERE TOTAL
SALES=TOTAL COST IT IS A SITUATION WHERE COMPANY IS IN A
POSITION OF NO PROFIT AND NO LOSS. AT THIS POINT COMPANY
RECOVERED ITS FIXED COST.
BREAK EVEN POINT IN UNIT :- MEANS HOW MUCH UNIT WE PRODUCE
AND SALE TO GET BREAK EVEN
| Is This Answer Correct ? | 60 Yes | 15 No |
Answer / rohitash
BEP is a level where an organization meets a situation of
no profit and no loss.
Formula=Fixed cost/Selling Prize per unit-Varriable cost
per unit.
| Is This Answer Correct ? | 24 Yes | 4 No |
Answer / mohammad sazzad hossain khan
): Break-even Point is refers to the level of operation at
which the project neither makes profit nor loss is
calculated.
Fixed
Costs
Break-even point = -----------------------------------------
------------
Unit selling price – Unit variable
cost
If the fixed costs are Tk. 15 million, unit selling price
Tk. 250 and unit variable cost Tk. 150, the break-even
point works out to:
Tk. 15 million
Break-even point = --------------------------- = 1, 50,000
units
Tk. 250 – Tk. 150
In the case of a new project where the capacity utilization
level is expected to rise gradually over a period of 3 to 4
years, fixed cost are normally planned in such a way that
are stepped up as and when necessary to meet the projected
increase in capacity utilization. Hence the calculation of
the break-even point for a new project must be with
reference to the fixed costs expected to be incurred in the
third year or fourth year when the project is supposed to
reach the rated capacity utilization level.
Answer (b):
Fixed Costs
Break-even point = ------------------- X expected
production
(In terms of volume of Contribution in the
year
Production)
6,000,000
= ------------------ X 90,000
= 54,545 Units
9,900,000
Fixed Costs
Break-even point = ------------------- X
expected capacity utilization
(In terms of percentage of Contribution in
the year
Installed capacity)
6,000,000
= ------------------ X 90% =
54.55 percent
9,900,000
Fixed
Costs
Break-even point = ------------------- X
expected sales realization
Of Sales (In terms of Taka Contribution
in the year
6,000,000
= ------------------
X 18,000,000 = 10,909,090 Tk.
9,900,000
| Is This Answer Correct ? | 19 Yes | 6 No |
Answer / guru dayal singh
Break-even Point is refers to the level of operation at
which the project neither makes profit nor loss is
calculated.
Costs
Break-even point = -----------------------------------------
------------
Unit selling price – Unit variable
cost
| Is This Answer Correct ? | 18 Yes | 5 No |
Answer / vikas wakchaure
Break-even Point is refers to the level of operation at
which the project neither makes profit nor loss is
calculated.
BEP is a level where an organization meets a situation of
no profit and no loss.
Formula:
Fixed Cost
BEP=--------------- 100
P/V Ratio
| Is This Answer Correct ? | 14 Yes | 4 No |
Answer / nirakar
BEP stands for Break Even Point, that means no profit no
loss. It's calculate mainly two types;
1. BEP in uinits, and
2. BEP in Rupees.
BEP in units= Fixed Cost(FC)/Contribution per unit
BEP in Rupees=Total Fixed Cost/Sales price minus variable
cost
| Is This Answer Correct ? | 12 Yes | 4 No |
Answer / navidhesh
BEP is the abbrivation of break even point. It stands for
no loss and no profit in business. It is calculated as
above given formula
| Is This Answer Correct ? | 7 Yes | 3 No |
Answer / srinivas annavarapu
Break even point is no profit - no loss position for a
business or product.
BEP for output
Fixed cost / contribution per unit
BEP for sales
Fixed cost / contribution per unit X selling price per unit
| Is This Answer Correct ? | 9 Yes | 7 No |
hi,i am mba finance student in 3 rd sem.how to i prepare for interview,i m intersted to banking sector.so which post i will get in campus selaction.
5 Answers HDFC, Nagarjuna Fertilizers,
What u know about J P Morgan and why you want to join j p morgan?
Do you anything about bureaucracy?
0 Answers State Bank Of India SBI,
If you have to operate your account, what are the various ways you can take?
What is Capital of a Company?
0 Answers Joint Stock Company,
What is a term loan agreement? What are its various clauses?
Tell something about the demonetization bill introduced in the Lok Sabha?
0 Answers State Bank Of India SBI,
Explain fixed assets and investments
Take Over Means?
Discuss your career progression.
What is Incorporation?
0 Answers Joint Stock Company,
3. Financial Management What will your outlook towards maintenance of liquid assets to ensure that the firm has adequate cash in hands to meet its obligation at all times?
4 Answers College School Exams Tests, NIBM, SDF, universal info service,
Business Administration (517)
Marketing Sales (1279)
Banking Finance (3209)
Human Resources (747)
Personnel Management (68)
Hotel Management (29)
Industrial Management (113)
Infrastructure Management (14)
IT Management (97)
Supply Chain Management (16)
Operations Management (39)
Funding (79)
Insurance (494)
Waste Management (1)
Labor Management (48)
Non Technical (73)
Business Management AllOther (546)