wats the procedure to calculate no of batteries for ups?

Answer Posted / k.prakashchandra

When the ups voltage = battery voltage,Number of batteries
required = desired back up hours x load /V x AH of each battery

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which power will flow first if we switch on a motor Active or Reactive? How?

4353


What is open delta Xformer? It's adavntages & Use?

1774


i need about 10 years of GATE solved papers in pdf format and even mock tests toooo

1201


In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?

710


What is a dominant pole?

681






What is dielectric loss?

645


how to calculate transformer load?

1945


how you configure motorvision relay (L&T make)from DCS

4324


How to convert a two phase power into a three phase power in induction machine?

1352


The principle of switching circuits for different types of batteries in application of storage systems

1527


234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,

1737


if grounding is notdone at regular intervals for long distance transmission, will the load connected at distribution end receive voltage during negativehalf cycle of the sine wave?

1548


What is the difference between PLC and Embeded system

963


how to carried out DAR test in 11 KV Alternator ?

1842


what are inductive and capacitive voltage transformers.what are their applications

1500