discuss the precautions to be taken during the various steps
of manufacturing of concrete
Answers were Sorted based on User's Feedback
Answer / varun.j
while going for the concrete mixing we have to take
precausions for the oldness of cement which is the ultimate
bounding material shouldnot be older than max six months
about aggregate it should be free from every suspended
forain particals like clay dust and mud and in sand it
should be more that .4mm water which added should be bet 6
to 8 ph value..............
Is This Answer Correct ? | 12 Yes | 2 No |
Answer / guest
Aggrigate size, water cement ratio, water quality, sand
(coarse),grade of cement.etc
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / vijendra singh
Aggrigate size, water cement ratio, water quality, sand
(coarse),grade of cement.etc
Is This Answer Correct ? | 0 Yes | 4 No |
1:4:6 grade 15.84cum and how much cement and sand aggricate are used
1 Answers Minartech Developers,
what is the minimum compressive strength in 7 days for m20,m25,m30
when we select buildup beam
Compressive strength of concrete
5 Answers B L Kashyap, Era Infra Engineering,
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
what do you mean by ssd how it calculated
what is the quantity of cement( in bags),sand and aggregates required for 1 cmt of M 25 concrete
how many meters for brad gauge?
what is mean by centrifugal force which is act in vehicle on superelevation of road?
how to calculate steel in slabs ?
what is the allowable silt % in river sand for Dam concreting.
time and work questions