discuss the precautions to be taken during the various steps
of manufacturing of concrete
Answer Posted / varun.j
while going for the concrete mixing we have to take
precausions for the oldness of cement which is the ultimate
bounding material shouldnot be older than max six months
about aggregate it should be free from every suspended
forain particals like clay dust and mud and in sand it
should be more that .4mm water which added should be bet 6
to 8 ph value..............
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
how statics is different from dynamics
why the profile of shell of natural draught cooling tower is hyperabolic.
why are you joining in this (applied post) job and your aim for this job
What is the basic difference between OPC
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
Explain what is alternate bid?
what"s the sort of beams?
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Name the main components of a cad gui?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
If specific gravity of cement is less than 3.15 what is the cause?
How much cement and sand required for 9"brick wall per square metre
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
I want to join bhel because