How do you prepare Material Recovery Statement for deduction from contractors bills?
Answer / Vandana
A Material Recovery Statement (MRS) is prepared to account for the materials recovered or reused in a project. To prepare an MRS, follow these steps:n1. Identify the recovered materials and their quantities.n2. Calculate the cost of each material based on its purchase price or estimated replacement cost.n3. Prepare a statement detailing the recovered materials, their costs, and any associated savings for the project.n4. Deduct the MRS amount from the contractor's bill.
| Is This Answer Correct ? | 0 Yes | 0 No |
Can any one give me any link to download civil engineering code in free ?
How to design a beam without any typical(tuff) calculation. Answer Only by using site practical knowledge?
For raft 3000mm thickness with T25150 mesh reinf in top and bottom what diameter can be used for chair to support mesh reinforcement
what is the compressive strenth of m30 grade cocrete column at 7 days
what opc & ppc cement $ composition?
How is make concrete cube?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
In which direction is bottom bar of rectangular footing is placed in short or long.
what is quick sand
Is the ratio fixed for M-20,M-25,M-30,M-35....grades of concrete??
2 Answers Ahluwalia Contracts, L&T,
How to calculate the quantity of ingredients of M20 grade concrete?
How can i display 5 asterisk and another 5 asterisk )?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)