what is poissons ration of steel?
Answers were Sorted based on User's Feedback
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
why cutting length in design of beam is rounded more for -r/f & less for for +r/f
Why use of fly ash in cement
what will happen if one could not properly follow the spacing of slab reinforcement bar?
0 Answers Yirgalem Construction,
Building construction
what is tension & compression of steel bending.
which one is strong? field weld or shop weld?
What is the proportion of cement agg. and sand for M20,M25 and M30?
How much area can plaster with one bag of cement?what is the size of the fuji blocks?
how we can estimate the M50 concrete for foundation?
Deshuttering time for slab 6.15 meter
what are the strenth of 1cum brick work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)