Answer Posted / rahul
in my point of view its .4
| Is This Answer Correct ? | 0 Yes | 11 No |
Post New Answer View All Answers
Civil engineering material testing Standard results
how to check and keep control on the wastage of material at site
How much percentage of brick bats allowed in CD-75 bricks
What is meant by cartesian coordinate system?
reinforcement slab, beam and column formulas?
How to marking the building
What is the distance between railway tracks?
what is Brick crushing strength(PSI)?
how many time use of plywood shuttering and IS code
What Are The Different Type Of Slump Test Indications?
Which is the direction of negative angle?
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
What are the ingredients of pre-stressed concrete?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.