In the field and in the control room different power
supplies if used How to handle the ground
Normally there should be different grounds in control room.
DCS or PLC vendor generally gives the drawing.
Mostly it is taken as convension that there should be 3
different grounding busbars in control room.
1. One is for the power earth. This will give the earthing
to the power distribution panel of the DCS or PLC.
2. Second is the Signal earth. All the shield cables will be
connected to this earthing busbar to minimize the
interference in the analog signal cables.
3. Thrd is Panel earth. This will be connected to the panel
body.
All these 3 busbars should be connected to 3 different
earthpits by 3 different Copper cables. Redundancy of
earthpits or copper cables may be there if possible.
| Is This Answer Correct ? | 3 Yes | 1 No |
can i calibrate DP transmitter online (while Tx in Service) if yes ,how?
How to do calibration of magnetic flowmeter
why we go for pcbs
Define all the process Variable and state their unit of measurement. ?
what is the diffrene between DCS System and PLC System
Who to difference between analog in & analog out in dcs?
what will be the pressure in tank which has the total level of 2 meters and is filled 1.2 meters ?
What is two wire system and how it work
What is maintenance planning?
What is the main three inputs of DCS?
HOW TO CALIBRATE A PRESSURE SWITCH?
list of flame proof certification ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)