In the field and in the control room different power
supplies if used How to handle the ground
Answer Posted / banerjeenandan
Normally there should be different grounds in control room.
DCS or PLC vendor generally gives the drawing.
Mostly it is taken as convension that there should be 3
different grounding busbars in control room.
1. One is for the power earth. This will give the earthing
to the power distribution panel of the DCS or PLC.
2. Second is the Signal earth. All the shield cables will be
connected to this earthing busbar to minimize the
interference in the analog signal cables.
3. Thrd is Panel earth. This will be connected to the panel
body.
All these 3 busbars should be connected to 3 different
earthpits by 3 different Copper cables. Redundancy of
earthpits or copper cables may be there if possible.
Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
why we us isolation barrier in hazardous area how it works to protect the area and please clarify its current flow.
How a conductivity sensor & analyzer work at boiler, whats the principle & science is beyond this,How conductivity sensor sence & convert signal & move toward analyzer & analyzer show reading in percent? also what is temperature compensate option in conductivity analyzer
I want to know about DDCMIS in detail ? please explain it. Also give name of reference books in which it is explained in detail in very simple manner.
explain key exchanges in all security modes WPA,WPA2,TLS?
in natural gas indirect water bath heater,how to prevent the problem of backfire from firetube during ignition...becoz of this backfire performance of wbh is going low.
Somebody can explain me about >Critical Loops, calibrations, ESD critical Loop checks, Logic Diagram / Cause & Effect checks for ESD loops,
what deference between panel earth and systemearth
line up procedure for dp type flow transmitter?
Can anybody tell me how to select the size of earthing cable for DCS & PLC system.Please tell me any relevant answer here or mail it to me.
what is the protection system in solar turbine compressor
how can be calibrate flow indication transmitter (rosemount) it shows excess milli amps nearly about 24 ma on full scale, but its scale was set on 20ma on full scale..???how can be simiulate..???
What is standard of DCS panel design?and what is step of DCS panel design?wiring and type of connector(screw or DB connector)
Hi my friends Is any one who can assist me in knowing the typical interview questions for system engineer at General Electric pty Ltd
What is the difference bitween control net scaner and device net scaner
what should he know if he is an assitent engineer instrumentation in cement industries of experience of 10 - 15 year.