what is productivity
Answers were Sorted based on User's Feedback
Answer / g.rajeshkannan
Productivity is a measure of how much input is required to
produce a given output i.e. output/input is called
productivity.
| Is This Answer Correct ? | 13 Yes | 0 No |
Answer / prabhat kartikey , me, iem, sg
Productivity =output/input
output=finsed goods, servicess etc
input = man, machine, material, maney ,methed.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / guest
getting more and more output by using optimum input.
| Is This Answer Correct ? | 5 Yes | 2 No |
Answer / hardie
productivity is the amount of output ( like production )derived from a given set of inputs ( like manpower,machines, capital,time )
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / grv
Productivity is defined as ration of output to input but it is measured by three points...
1. getting more output from fixed input
2. getting same output but input should be reduced continuously
3. getting more output with more input but increase in output must be more than increase in input
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / raghavan shaji
Productivity is the output of optimum resources.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mnithyanandam
overall equipment efficency is called pqcdsm techniques.
| Is This Answer Correct ? | 0 Yes | 1 No |
Can any One Help me to Know about Fire hydrant and its related water Pressures
HOW TO EVALUATE THE ACCURACY ADJUSTMENT pressure switches, given a point in switching operations or on the extent Pressure Switch
start-up procedure of a centrifugal compressor
Why we use pneumatic instrument.
What is vendor development? What is the logistics transport control?
What is the purpose of cost accounting?
Can we Use AC Servo Motor with Variable Frequency drive instead of Servo Drive? OR with VFD, only simple induction motor can be connected? VFD (Variable Frequency Drive)is having facility of Encoder Feedback.
we are using centum vp as monitoring with Dell precision work station T3600 but some times PC(s) are restarted automatically . how we can solve this problem? thanks
why we use log files in QTP?
what is called DC in supply chain management?
THERE IS A SQUARE ABCD. A LINE AF IS DRAWN FROM THE POINT A TO POINT F WHICH LIES ON THE LINE OF THE SQUARE BC AND ANOTHER LINE DE IS DRAWN FROM THE POINT D TO POINT E WHICH LIES ON THE LINE OF THE SQUARE AB. THE LINE DE AND AF INTERSECT AT O. IT IS GIVEN THAT AE AND BF ARE EQUAL AND AO IS 4cm AND AE IS 5cm. FIND EO.
Can you calibrate, troubleshoot and repair instruments? Which tools do you use for the same?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)