i badly need a chemical process details for making a
project...plz help me out......i m a btech final yr chemical
engg student in a govt univ,and we have to make a detailed
project on any chemical process with contents
like...intro,kinetics , material
balance,thermodynamics,process layout,process
design,physical conditions,plant location,cost estimation
etc.............if any one could help me i will never forget
hi thankless work and always try to help u in whatever u
ask.............
Define "good" cooling tower water?
what is the purpose of capacitor? and capacitor load means what? how does it connect?
dear sir/madam, I had applied for the post of officer trainee so plz if u have any papers both technical or aptitude plz inform me on sonalichavan01@gmail.com
Chemical Engineering Energy Balance - Please match the term A - E as follow with the stated definition : A. Yield. B. Selectivity. C. Relative saturation. D. Molal saturation. E. Absolute saturation. i. Answer : ? (moles of desired product formed) / (moles that would have been formed if there were no side reactions and the limiting reactant has reacted completely). ii. Answer : ? (moles of desired product formed) / (moles of undesired product formed). iii. Answer : ? (relative humidity 40 % means partial pressure of water vapour equals 4 / 10 of the vapour pressure of water at the system temperature). iv. Answer : ? (moles of vapour) / (moles of vapour dry gas). v. Answer : ? (mass of vapour) / (mass of dry gas).
Explain how is waste heat boilers categorized?
How are vessel lined with glass or how are they coated?
How to calculate 40% of level in cylindrical vessel?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).
What is the ignition temp. of Aluminum,Coper&Iron.
i want sample inteview question of chemical engg for BARC
Can large temperature differences in vaporizers cause operational problems?
Which type of pneumatic control valve is used mostly Either Air to Open r Air to close the value And guys I need reason for your reason
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)