What are the responsibilities of a site manager?
No Answer is Posted For this Question
Be the First to Post Answer
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
Explain about Sulphate Resisting Cement ?
How to calculate Cement, Sand and Kapachi required for M20, M25
how much wall area covered by 1 kg of lapi(putty)
qty of cement,sand and aggregate (1:3:6) required for RCC Slab size 1000 x 500 x 100 mm
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
0 Answers College School Exams Tests,
what is BPM in concrete demolition hammers. what is better a higher value or lower
What is the thumb rule for calculating the number of chairs in slab?
what is diffreant types of water proofing chemical tell me please
10mm Rebar total 12meters length how to calculate ?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?