I measured pcc work as 15.34 m cube , the ratio is
1:5:10 ,want to know the cement, sand and metal used for
pcc measured as 15.34 m cube at this ratio.
No Answer is Posted For this Question
Be the First to Post Answer
how to stop beam concrete between column
say the propotions of different concrete mix desidn(M20 M15 M25 M25 M30)
how to calculate sand, cement quantity for plastering (1:5)? what"s the formula?
1 cubic meter contains how many bricks
47 Answers Guru Tech, Krati Enterprises, L&T,
What is the accepted silt content in sand for concreting purpose by volume method?
How to calculate bottom width of landing in a staircase
What's the expanded form for NMR?
How to calculate the crank length of the rod in beam? Please give me a details.
i Have Completed a Intermediate Vocational (Construction technology) with Bridge course ,iam elegible to join in Institute of Surveyors(india).
can any one explain bar bending schedule of bems and columns and slabs ??
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
details of steeel
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)