What do you understand by “preset” during the installation process of bridge bearings?
Answer Posted / Manju
Presets in Bridge Bearings refer to the initial deflection or movement of the bearing at the time of installation. This is often done to accommodate slight differences in the alignment of the structure during construction, and it allows for controlled movement under load conditions.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
What is Density of cement, sand & aggregate ?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
400 ku d/c clearess ketan hota hai?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
pls mail some more tecnical qustions at msaranya2610@gmail.com
What is the strength of 1:6:12 mix?
what is the difference between replacement of cement by groundnut shell ash
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer
what is the 0 value in quantity surveying
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.