adspace


What do you understand by “preset” during the installation process of bridge bearings?

Answer Posted / Manju

Presets in Bridge Bearings refer to the initial deflection or movement of the bearing at the time of installation. This is often done to accommodate slight differences in the alignment of the structure during construction, and it allows for controlled movement under load conditions.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

2556


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

2105


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

2211


What is Density of cement, sand & aggregate ?

1610


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

2059


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1618


400 ku d/c clearess ketan hota hai?

2124


hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com

2365


pls mail some more tecnical qustions at msaranya2610@gmail.com

2180


What is the strength of 1:6:12 mix?

3159


what is the difference between replacement of cement by groundnut shell ash

3306


Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.

2428


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3236


what is the 0 value in quantity surveying

2479


Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.

2493