Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What could be a possible cause for sudden foaming in a cooling tower?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Chemical Engineering Interview Questions

Question 63 – Autocad computer program is used to draw a pipe that is used to transport natural gases for processing. Actual length of the pipe is 10 metres. The pipe has cross sectional area of circle in shape with measured circumference of s = 3 metres. (a) If 10 units are used to represent the actual length of the pipe in computerised engineering drawing, find the diameter of the pipe, d that will be shown in the engineering drawing. (b) If one unit in the program equals to 1 centimetre, find the scale used in the computer program.

1 Answers  


What are the chemicals are required for cooling tower passivation? Please mail me in my Email id:-nsput2000@gmail.com

3 Answers  


What is the maximum recommended velocity for steam in a plant pipe network?

0 Answers  


Chemical Engineering Material Balance - Three hundred gallons of a mixture containing 75.0 wt % ethanol and 25 wt % water (mixture specific gravity = 0.877) and a quantity of a 40.0 wt % ethanol - 60 wt % water mixture (specific gravity = 0.952) are blended to produce a mixture containing 60.0 wt % ethanol. The specific gravity of a substance is the ratio of density of a substance compared to the density of water. The symbol of weight percent is wt %. (a) Estimate the specific gravity of the 60 % mixture by assuming that y = mx c where y is wt % ethanol, x is mixture specific gravity. Values for m and c are constants. (b) Determine the required volume of the 40 % mixture.

1 Answers  


what is the role of a chemical engineer on a cement plant?

4 Answers  


did sulphur been a byproduct after the combustion of LPG and Natural Gas

3 Answers  


What are some guidelines for designing for liquid and gas velocities in process plant piping?

0 Answers  


Why do we apply on iron articles?

0 Answers  


What is the ignition temp. of Alluminium,Coper&Iron.

0 Answers  


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.33 : An engineering corporation that produces a type of healthy food has A number of shares of $B preferred stock and C number of shares of $H common stock outstanding. In a typical financial year, let the net income obtained = D. The amount retained by the corporation = E. (a) Calculate the amount of money distributed to the shareholders if : (i) D > E; (ii) D = E; (iii) D < E. (b) Let preferred dividend = F, common dividend = G, CH > G. Find the values of F and G, in term of A, B, D and / or E when : (i) (D - E) > AB; (ii) (D - E) < AB; (iii) (D - E) = AB.

1 Answers  


what is the difference between absorber and scrubbers

4 Answers   Parco,


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.27 : A biochemical engineering consultancy applies construction accounting in its finance. Its project began on 1 January 2010. Total revenue generated from the project was $9000. On 1 January 2011 as the budget, $2000 had been spent, with $6000 expected. However, the project cost increased latter, causing deviation from its initial budget on 1 January 2012, where $7000 had been spent, with $1400 expected. Let (estimated total cost) = (spent cost) + (expected cost to be spent), (percentage completion) = 100 (spent cost) / (estimated total costs), (total expected profits) = (total revenue) - (estimated total costs). Calculate : (a) total expected profits on 1 January 2011 and 1 January 2012; (b) estimated total cost as and not as the budget; (c) percentage completion of the project since the project began, in the first and second years.

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)