How to build the floor to ceiling bookcase?
No Answer is Posted For this Question
Be the First to Post Answer
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
What is the order of MIX Design of concrete? a)Cement :Stone:Sand b)Cement :Fine aggregate :Coarse Aggregate?
How to fix toll charge for a particular vehicle at toll booths in a highway?
What is c.g.i sheet which used for roof??
What kind of soil has what bearin for pile work? eg sand with high water table collapses faster, black cotton soil is ideal, sand leads to more wear and tear of the boring consumables, rock takes longer and require rock augers etc etc
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
WHAT DO YOU MEAN BY MIX DESIGN OF CONCRETE?NAME THE VARIOUS METHODS OF CONCRETE MIX DESIGN.EXPLAIN I.S.METHOD OF MIX DESIGN
What is meant by M20 grade of concrete???
In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
What is Architect-Prepared Contract?
How to hide dimensions in autocad?
how can we calculate costing of a project per sqft/sqm
1 Answers Associate Consultant, AVT, L&T,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)