Why Is Propping Required For Long Structures Once The Form Work Is Removed?
No Answer is Posted For this Question
Be the First to Post Answer
which is cover of r.c.c. column,beam and slab
Design a rectangular channel.
0 Answers CSI, Engineers India Limited,
Two types of piling
what is the density of compacted earth and jamuna sand
why main steel is to be reinforced in shorter direction in case of slab?
11 Answers CG, ESRT, Kirloskar, Lokmat, Priya,
How much cement & coarse sand is used in 1 Sqm plaster for ratio 1:4 of thickness 20 mm ?
what is the proedure to do soundness test in cement? What is the maening of soundness? Why we do it for cement?
I have to conduct load test on greting cover, pressure gauge is in kg cm2, how to caluculate load on this greting cover.
what r remedies taken for foundation in black cotton soils..??
how many bags of cement required in neat cement finish per square metre
Whether dry volume or wet volume of concrete more but why?
significance of specific surface area of particles?