My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
what is the minimum and maximum water cement ratio
waht is the angle of reposae
How do you calculate the power of a centrifugal pump?
How calculate the water for 1m3 concrete
explain water proofing in toilets and terrace
detailed calculation of the amount of cement used?
What are the tests conducted on coarse aggregates ?
how to caluclate sienerge qty in construction in ap
0 Answers Rites, VR Residency,
we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?
what is the coefficient for running feet to cft coversion both area and price
1m=3.281feet in that what is .281 mm cm m or anyother
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)