Railway Basic electrical engg technical question with answer
can we run all LT motors at 360 volts which are normally rated 415+/-10% voltage rating
What are the safety equipments you should use while you are in a hvac switch yard
1 Answers GPSC Gujarat Public Service Commission,
can i connect the two phases of scott connected transformer,if not why?
wat is the difference between BE &BTECH.
What is load shedding?
Define motor & pump?
Why we use duplex coil and hook switch in telephone system?
54 Comments Alok and Bhanu play the following min-max game. Given the expression N = 38 + X*(Y – Z) where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be?
what will happen if the secondary of current transformer kept open....
i installed 100kva ups. what KVA genset they should provid in input side? plz any update formula or ans with reason.
hi frnz,can somebody give me any project work? i am a 2nd year student & interested in practical works...plz give me some projects
Basic philosophy of applying 3P tripping for uptill 132KV switchyards & for 132KV & above 1P/3P tripping is used.