What is the difference between built area and super built up area?
No Answer is Posted For this Question
Be the First to Post Answer
2. What are the advantages of your present job, things you like about it?
How to calculate the quantity of materials for M20 grade concrete
1) one brass of stone aggregate 20mm is good for how much sq.ft. work of concrete beam and 2) one brass of river sand is good for how much sq.ft. work of concrete beam . if ration is 1:4:6. at the same time how many bags of cement will be required for same work if each bag is of 50 kgs . please help me.
describe about Hollow bricks? where the hollow brick "ll use& what"s the purpose?
What are the methods of measurement? Describe it shortly
in 100 cft = 1350 bricks in 100 cft = ? bloks
what is the productivity in aluminium shuttering per day
how to calculate concrete qty for footing using M25 grade 1:1:2 for 731 cft.
9 Answers Abuilding Lab, L&T, MPSC, Vellapally,
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
Brick work how many days curing and at any concreting pl
Define line type?
how many bags 0f opc cement in 1 m³
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)