how many bricks required for below volume 1. depth filling 0.00 Qty 1.61 & Unit Cu.M
2. D-Filling 300 Qty 2.0 & Unit Cu.M 3. D.Filling 450 Qty 2.24 & Unit CU.M 4. D-Filling 600 Qty 2.44 & Unit Cu.M
Answer Posted / suman
750
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
What is the difference between Hinged and pinned in Column ends
about higyway engineering
What is the difference between built area and super built up area?
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
What is Time period of a building and its relation with frequency ?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
Explain what is structural frames or systems?
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
Are cruise ships built for the transatlantic run?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
Why concrete barriers have curved surface profiles?