Which percentage of carpet area use in plot area of office building.
No Answer is Posted For this Question
Be the First to Post Answer
In two way slab where should we stop the work at end of the day?
why did you choose this career
how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 example= i have 8.15 m2 how to estimate quantity
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow? sand=Rs.500/mt Brick=Rs.5/brick Labour=Rs 300/day Free issue=cement+water+electicity.
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
if water absorption is more than 25 percent in brick, what is the defect in it?
What are new technologies in civil engr. that can reduce construction cost?
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
the coefficient of curvature for a well graded soil must be inthe guage 0.5-1 3-4 4-5 none
what is the formula for lapping length
How will you Engage Labours on Site?
0 Answers Amarprakash Developers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)