How you calculate
cement,sand,20mmbluemetal,40mmbluemetal,bricks for various
works
Answer / mohanraj
Gererally it is vary from ratio to ratio. For example C.C
1:2:4 for 20mm gravel. First we add all the ratios ie.,
1+2+4=7.then we divide individual ratio by total ratio and
multiply 1.57m3. Cement=1*1.57/7=.224m3.Sand =
2*1.57/7=.45m3 20mm gravel= 4*1.57/7=.90m3.For 40mm gravel
multiply with 1.52m3.
| Is This Answer Correct ? | 2 Yes | 3 No |
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
0 Answers Vishal Pipeline And Engineering,
how many labour is required for 1cum of concrete?
what is superelevation?
what is the difference between compaction and consolidation??
Why is DPC not provided at sills of doors?
What is a MIS report?
polavaram project is situated inwhich place?
How Can You Design Aisolated Footing Subjected To Tenstion Force?
WHAT do mean by M-309
what is the length of a steel bar when it buy for the site????
brick size-230x110x75, how many no of bricks cover 1cubic meter.
Why we do soil classification?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)