How you calculate
cement,sand,20mmbluemetal,40mmbluemetal,bricks for various
works
Answer / mohanraj
Gererally it is vary from ratio to ratio. For example C.C
1:2:4 for 20mm gravel. First we add all the ratios ie.,
1+2+4=7.then we divide individual ratio by total ratio and
multiply 1.57m3. Cement=1*1.57/7=.224m3.Sand =
2*1.57/7=.45m3 20mm gravel= 4*1.57/7=.90m3.For 40mm gravel
multiply with 1.52m3.
Is This Answer Correct ? | 2 Yes | 3 No |
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
technical name of shuttering plywood
HOW we can calculate the quantity of sand and cement for 1:4 plastering with a thickness of 12 mm..total area need to be plaster is 985 sqm
What is lever arm distance
What is bending moment
What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.
how statics is different from dynamics
what is the main difference b/w compaction and consolidation
How to determine thee cut length for steel reinforcement bars in R.C.C design
how many minimum admixtures are used in water froofing structures
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
how to calculate the scour depth