A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill.
Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
No Answer is Posted For this Question
Be the First to Post Answer
what id a dry type transformers and its function ?
define displacement & magnitude ?
How can claculate to attain the desired PF in the line ( HOW Much KVAR is required ) Pls Give the formula?
What are the types of TESTS in CIRCUIT BREAKERS based on Testing and commissioning?
Slipring moter find external resistance
railway exam in asst loco pilot old test paper
25 Answers Indian Railways, Loco Pilot, RRB, Southern Railways, TATA, Vimal,
Why alternators are designed at 0.8 pf lag?
advantage and disadvantage of team work?
Can we test the alignment of End shield and stator of turbogenerator without rotor insertion? Also how to fix maintain the alignment at site installation?
FACP Means
what happens if we connect two parallel ideal voltage sources across resistor?what is current flowing through resistor?
WHY IN AC DRIVES,INPUT PHASE CURRENT SHOW UNBALANCE?