why are use steel with conc. instead use of other type materials.
Answers were Sorted based on User's Feedback
Answer / nazar ahamed
Concrete is good is compression strength and steel is good is tensile strength, the combination of both materials will give the better strength and flexibility
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / sandeep punwatkar
steel can withstand high tensile stresses as compared to other material and concrete is very good in compression but very weak in taking tension.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / jagan_srinivasan2002@yahoo.co.
1)Steel has good tensile stress
2)it will develop the good bond streets with concrete
3)Modulus of elacticy is high
| Is This Answer Correct ? | 0 Yes | 0 No |
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
What is the difference between undo & redo?
What is the Density of Steel & Conccrete
mix design procedure for 1:6 cement mortar
How much binding wire required in 1 MT Reinforcement? How much Nails Required in 1 Sqmtr Area work progressed
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
What are the important hardware systems used for cad?
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
10mm aggregate 1brass = How many KG
1 Answers JMP, Rathore Group, Trishul Construction,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)