How do ACB are maintenance, what are the problem occurred in ACB
Answer / harish
Problem made though acb is over loading of supply and late cut of energy.
Is This Answer Correct ? | 0 Yes | 0 No |
1.what is meaing of ups,and used in softwares and sud stations,and main partes in ups. 2.main partes of the Disel Genarator. 3.main partes of the chiller and safty equipments.
For 33 kv HT line how much amps fuse to be fitted pls explain with formula
What is the meaning of Insulation H for transformers????
why the rating of dc generator is in kw where as rating of alternator is in kva?
how much amp MCB is required for 1/2 kva power back up?
im working in one private compeny in gujarat. i was complet diploma electric in 2010 from gujarat technical board. now i want electric supervisor licence in gujarat but i dont't know when i apply? plz give me address of the licence dippartment office in gujarat. gandhinagar
why the transformer was not rotating like a motor?
why transmission voltages are in multiple of 11kv?
Is it possible to increasing the real power generation by reducing the reactive power in power generation plants
Dir sir we have 750 kva Caterpillar dg set we are fas on different problem we start dg set ofter 1 mint apply load around 500a dg was run one or 3 mint after 3 mints dg was shutdown automatic how to face tis problem
In Transmission System if the potential difference at the two end of line are same then is the transmission of power will continue ? if yes then how.
what is the IS foe lightning arrester?