How to layout the site plot ? Method with explation
Answer / muhammad sami
If we are using total station so we use stake out mathod
But manual by meter first we make right angel of building and fix the three points of building and after measures dimensions for grid line from fix points
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the load bearing capacity of the scafolding pipe (50mm) and other.
If at site iam supposed to get M30.But by mistake i got M20 mix. How could I differentiate the mix before placing?
What is full form of SNF base in concrete mix design for admixture percentage?
Cemen-1 Fine agr.-2 Core agr.-3 calculate for per 100 qube feet (qubic feet wise)
1:6 brick masonry cement and sand calculations
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
How to arrive dry volume of concrete (1.52 to 1.57) ?
what is the minium content of cementous material per cu meter
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
What is the bending moment ?
1 Answers L&T, Manav Infra Projects,
state and explain in Water absorption of brick
what is the status of Brick & cube testing
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)