Answer / muhammad sami
If we are using total station so we use stake out mathod
But manual by meter first we make right angel of building and fix the three points of building and after measures dimensions for grid line from fix points
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the functional requirement of cement plaster in RCC members & masonry?? Is it Manditory to do plastering on all RCC members(beams, Columns, Slabs)? in what places plasterring could be kept as an optional one???
Explain the difference between shear and tensile strength.
What is mean concrete class c35/20. Here C35 and 20 means?
five requirements of infill panels for walls?
Explain what is progress payment?
what is the projected employment outlook for this carrer?
what is defenation the rolling margine ? .. what is % for steel & what its effects if it is + or - ?
what is the heart of civil engineering
What will be the maximum length of RCC Lintels?
I want to calculate the footing 90º L bend as a techincaly
a)tell density of steel , concrete, bricks , sand and aggregates.? b) what is knife test for wooden doors ? c) what is the meaning of term abrasion? what is tested in it? d) why pile foundation is provided in BCS?e) By total station what activities can be performed and on what principle it works? f) what is creep?
18. What is the thing that might make you happy at your work place?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)