How to layout the site plot ? Method with explation
Answer / muhammad sami
If we are using total station so we use stake out mathod
But manual by meter first we make right angel of building and fix the three points of building and after measures dimensions for grid line from fix points
Is This Answer Correct ? | 0 Yes | 0 No |
how many moisture content in well seasoned timber
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
what is the procedure to make compressive strength test for concrete cube in lab
1)How to calculate concrete cube testing load by area in mpa 2) in kg/cme also
what is the creep in concrete
while doing floring in a room,from where one can start laying tiles.
11. What was the reason for you to quit your previous job?
What is is code for use TOR
What is civgl engg?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how much cement and sand 1:6 plastering