How to layout the site plot ? Method with explation
Answer Posted / muhammad sami
If we are using total station so we use stake out mathod
But manual by meter first we make right angel of building and fix the three points of building and after measures dimensions for grid line from fix points
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
a solid steel rod length 2m dia and 20mm vertically hangs from celling and has a collar firmly atteched to it. above the collar an annular rubber washer of 40mm th. having stifness k = 5n/mm is placed. determine maximum stress in the rod caused by mass of 5 kg falling through a height of 1.2m.
Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?
cement and sand required for one block of size 0.23*0.15*0.46
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
States some of the commonly used commands in cad software’s?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
from where ican get sample papers for CET-delhi 2012
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
Cement consumption of one cubic meter of aerocon blocks masonry?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?