Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how can change 10mm dia @275 c/c bar spacing to 12 mm

Answers were Sorted based on User's Feedback



how can change 10mm dia @275 c/c bar spacing to 12 mm..

Answer / soham manna

400mm

144/100*275=396mm or 400mm

Is This Answer Correct ?    10 Yes 4 No

how can change 10mm dia @275 c/c bar spacing to 12 mm..

Answer / anusha

Spacing is directly proportional to square of diameter, so
X/275 = 12^2/10^2
X= 396 mm c/c
as per IS 456:2000, spacing should not be greater than 300mm
X = 300 mm

Is This Answer Correct ?    6 Yes 1 No

how can change 10mm dia @275 c/c bar spacing to 12 mm..

Answer / s k majumder

10/275 = 12/x



x= 330 mm

As dia increase spacing will be increase. however better to spacing limited to 300mm

Is This Answer Correct ?    6 Yes 4 No

how can change 10mm dia @275 c/c bar spacing to 12 mm..

Answer / anandbala

12 MM

Is This Answer Correct ?    1 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

If we use oil,inner on the column box, it'll make rust on the column steel?

4 Answers  


CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL

0 Answers  


How do we calculate the weight of aggregates, sand and cement M 25 design mixfor 1 cum

1 Answers  


how much quantity of binding wire required for tieing of 1mt of reinforcement bar?

5 Answers  


what is BPM in concrete demolition hammers. what is better a higher value or lower

0 Answers  


1cubic meter of bricks = ? kg

1 Answers  


A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?

5 Answers  


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

0 Answers   Wonderla Holidays,


can u plz send me ntpc placement papers(civil engineering) at munjalricha1988@gmail.com and which types of questions are aked by ntpc

10 Answers   HPCL, NTPC,


What is the force exerted by the tacoma narrows bridge?

0 Answers  


Who designed the city of washington dc?

0 Answers  


What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet

0 Answers   Tirupati Exim,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)