how can change 10mm dia @275 c/c bar spacing to 12 mm
Answer Posted / s k majumder
10/275 = 12/x
x= 330 mm
As dia increase spacing will be increase. however better to spacing limited to 300mm
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
What is the method of soil replacement test?
What are the uses of alloys in daily life and how are alloys made?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
What is the strength of 1:6:12 mix?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
Which architectural movement is also known as jazz moderna?
Describe the role of independent Quantity surveyor?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
what is diffrence between catchment area,watershed and basin?
What is meant by cartesian coordinate system?