If length is 20 m ,width is 20 m & thickness is 80 mm then how many brass it is?
Answers were Sorted based on User's Feedback
Answer / nadim abdulgafur shaikh
20 x 20 x .08 = 32 cu.mt
32 x 35.29 ( cu.mt to cu.ft ) = 1129.28 cu.ft
1129.28 / 100 = 11.2928 say 11.30 brass
| Is This Answer Correct ? | 7 Yes | 0 No |
What kind of foundations used in block cotton soils
Rust in Rod is harmful in structure because -––
Explain what is progress payment?
How to convert 0.44 N/MM2 in to Kgf/cm2
2 Answers Ukay Metal Industries,
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER.
Types of pipes?
How many number of cement bags per running metre are required to cast pileof M-20 grade
cement and sand required for one block of size 0.23*0.15*0.46
The ff slab casted its thickness 100mm.2nd floor slab will be casting its 300 mm.how we shall be given suppot to that 300mm thk slab.ple way me
what are the five benefits of using standard terminology in the measurement process?
9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)