1)pile is of 200mm dia.-- a)tell the cutting length of ring
considering 2cm cover b) tell the quantity of concrete
considering pile length as 3m c) tell concrete quantity in
bulb
Answers were Sorted based on User's Feedback
Answer / rohit
Mr. Srinivas,
Can u tell the calculation formula.
Regards,
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / srinivas.maradana
1)The 200 pile reinforcement cuuting lengtg 050mtr with
lap060 mtr
2)the qty is 00942 for 3 mtrs
| Is This Answer Correct ? | 1 Yes | 4 No |
For Beam steel reinforcement detailing, in the End of the beam do the making of L shape in the rebar is essential in all the cases, specially in the ends of the Beam?
Can we weld hot rolled steel ASTM A615 ?
How much quantity of coping is done per day by one mason in Rmtr?
how we can prevent freshly laid concrete from rain ,, What the plastering thickness for a) inner brickwork b) outer brickwork c) beams & slabs
what is meant by geosyntahtic system
WHAT DLC DESIGN IN CONSTRUCTION
What is logic behind the use of Steel bar insted of gold bar?
which "s the best wood for commercial purpose?
how to find the carpenter work per day? how many cubic feet they should be work per day?
What are the different grades of concrete & their ratios?
what are the construction sequences in DAM, Hygh Way / Road, Thermal Power Plant, Hydro Power Plant, Tunnel ?
What is the Content in RCC M 35 Grade e.g water content,sand,metal ,cement etc.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)