1)pile is of 200mm dia.-- a)tell the cutting length of ring
considering 2cm cover b) tell the quantity of concrete
considering pile length as 3m c) tell concrete quantity in
bulb
Answers were Sorted based on User's Feedback
Answer / rohit
Mr. Srinivas,
Can u tell the calculation formula.
Regards,
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / srinivas.maradana
1)The 200 pile reinforcement cuuting lengtg 050mtr with
lap060 mtr
2)the qty is 00942 for 3 mtrs
| Is This Answer Correct ? | 1 Yes | 4 No |
How calculate Load Bearing Capacity of Soil?
in a mix if desired concrete slump is not obtained , the adjustment of each concrete slump difference is made by adjusting water by which percentage
what is mean by centrifugal force which is act in vehicle on superelevation of road?
08. 4 main points about check list for Shuttering works are––– 4 i) ii) iii) iv) 09. 4 main points about check list for Concreting works are––– 4 i) ii) iii) iv) 10. 4 main points about check list for Plaster works are––– 4 i) ii) iii) iv) 11. 4 main points about check list for Brick works are–– – 4 i) ii) iii) iv) 12. 3 main points about Project delaying factors are––– 3 i) ii) iii) 13. Write down 60-grade M.S. deformed bar specification. 3 14. 3000 psi concrete means: 1 15. 4 main points about methods of wastage control are–– – 4 i) ii) iii) iv) 16. 1 main point about reasons for your honesty is : 1 17. Water cement mixing in hopper less mixture machine is better than hopper mixture machine because: 1 18. 2 main points about your role during roof casting are–––– 2 i) ii) 19. a. The weight of 3333m deform bar of 24.5 mm dia is…… 1 b. The weight of 300 rft plain bar of dia 1 is……. 1 20. The types of slumps are––– 3 i) ii) iii) 21. 4 main points about the causes of cylinder failure are––– 2 i) ii) iii) iv) 22. Detection of a beam & a girder are–––– 2 i) ii) 23. Curing is needed for–––– 1 24. The types of slabs in respect of size & shape are––– 5 In respect of size: i) ii) In respect of Shape i) ii) iii) 25. The types of Column in respect of size & shape are–– – 9 In respect of size: i) ii) In respect of Shape: i) ii) iii) iv) v) vi) vii) 26. 3 field tests & 3 Laboratory tests of bricks are––– 6 Field tests: i) ii) iii) Lab test: i) ii) iii) 27. 2 field tests & 1 Laboratory tests of sand are––– 3 Field tests: i) ii) Lab test: i) 28. 1 field tests & 1 Laboratory tests of M.S rod are––– 2 Field tests: i) Lab test: i) 29. a. The % of water absorbs by brick chips: …………… 1 b. The % of water absorbs by Stone chips: …………… 1 30. In respect of design: 5 a. The % of strength gains by concrete in 28 days= b. The % of strength gains by concrete in 14 days= c. The % of strength gains by concrete in 07 days= d. The % of strength gains by concrete in 03 days= e. The % of strength gains by concrete in 28 days without curing =
RCC colums of 15"X9" each, roof height 10.5'ft, total pillars 12 nons. Span between pillar to pillar is 14/20/20 length wise and 17/14 width wise. Total Slab area 2400 sft and plinth area is 1900 sft. beams are 12"X12". kindly calculate load factor per sqft.
2 Answers ABS Construction, L&T,
What is the specific weight of sand?
How many times one TMT bars bents & straight upto not broken the bar.
What is the difference between EPC,DBOOT and BOOT.
how much cubic feet cement contain in one bag
During reclamation how can the occurrence of mud waves can be rectified?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
what is the hanekom repairing material after concreting work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)