how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
No Answer is Posted For this Question
Be the First to Post Answer
why does only water ads in concrete?
what are the forces acting on gantry girder
How to get cinema chance?
questions with answers to face an interview of an civil engineer regarding RCC buidings
0 Answers Horizon Computers, NBCC,
Describe the various methods of concrete curing?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
From which end do you start deshuttering in a) cantilever portion b) simply supported portion
what is workability,define it?
Why is the statue of liberty made of copper?
What should be the required steel in column, beam and slab
What is the basic difference between QA and QC
hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)