how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
No Answer is Posted For this Question
Be the First to Post Answer
rate analysis of shuttering
Which is code is used for measurmenr of reinforcement steel work.
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
what is porosity??
in the footings first which reinforcement bar has to be layed as per design criteria.
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
1)What is the maximum size of aggregate that can be used for M-50 grade concrete ? Code teh authority?
For Beam steel reinforcement detailing, in the End of the beam do the making of L shape in the rebar is essential in all the cases, specially in the ends of the Beam?
WHICH IS BETTER,BURNT BRICKS OR SOLID BLOCK IN CEMENT MORTAR
how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars
how i can tak Quantity of mortar in block work
how to calculate no of rings & weight of column including rings?
2 Answers HCC, Shivam Constructions,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)