how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
No Answer is Posted For this Question
Be the First to Post Answer
What is factor not to be taken in consideration in mix design?
Sir how to find cutting length for footing steel bars in the shape of "u"
Define current ucs?
How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3
What is meaning of tlc
Where hinge support is used in residential building?
What is the graphical relationship between N - Value of soil and Dia. of pile when pile length is fixed, and n - Value and length of pile when its dia. is fixed.
What material should be used for casting the beam-column junction if beams and columns are of different grades?? For example concrete in beams and Columns is M20 and M25 respectively.
What is bylayer?
what is the diffrence of opc and ppc cement ? expailn
15mm thick plastering 1:4 what is the cement consumption per sqm
How to get cinema chance?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)