how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?

Answer Posted / Sheetal Jadhav

Estimating costing from quantities given in the Bill of Quantities (BOQ) involves the following steps:
1. Determine the unit rates for each item based on material and labor costs, taxes, and profit margins.
2. Multiply the quantity of each item by its respective unit rate to obtain the total cost.
3. Sum up the total costs of all items to get the estimated project cost.nFor tendering, you can use this estimated cost as a base to create a tender document, which includes detailed specifications, drawings, and other requirements for potential bidders.nThe final rate for particular work will be determined by selecting the lowest bid that meets the project requirements, while considering factors such as experience, reputation, and capacity of the contractor.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.

2236


Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?

2087


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2237


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1842


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1618


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2314


please send me bhel questions on rupesh.017@rediffmail.com

2797


What is Density of cement, sand & aggregate ?

1615


water leak detection system question & answer

2527


Technical Question of Civil Engineering

2358


pls mail some more tecnical qustions at msaranya2610@gmail.com

2184


can i get civil engineering test papers.......?????

2550


400 ku d/c clearess ketan hota hai?

2124


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3239


What is the strength of 1:6:12 mix?

3159