when we calculate concrete volume in footing the column along with footing up to the ground level is also taken or not ?
what is a pretension and post tension with an example
Can fly ash bricks can be used in brick bat coba?
1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40
What is absolute pressure? How absolute pressure is calculated?
how to calculate the cement, sand, coarse aggregate required for one cubic meter of concrete?
what is specific gravity of soil?
Define What are the reasons for geotechnical site investigations in Uganda?
Please tell me how many bricks needed for 4.5" bricks per m3(how to calculate this also), and outurn of mason. Thanks.
how much binding wire is reqd for 1 MT
why moment is create in fixed beam. And why moment is not create in simply support beam
How i calculate Cement sand Quantities in 100 Sq.ft Plaster?
how did find the quantity of cement ,sand , and aggregate in concreat which is givan by volume
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)