what is the sequence of the activities in the typical under
ground water tank including civil & MEP works.
No Answer is Posted For this Question
Be the First to Post Answer
What is PCO
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
how the sand fail?
For fine aggregate which is most suitable River sand or crusher sand & why ?
which one is economical construction brick masonry or sold block masonry?
How to rectify thermal cracks (2mm wide, 9mm deep aprx. ) developed in tremix finished concrete floor?
What is the procedure of concealed plumbing in toilets?
What is Shoe Footing ?
2 Answers Bhandari Associates,
What is the zero value in quantity surveying
Which is stronger solid steel rod or hollow steel pipe?
What are the benefits of rcc pipes over steel designed pipes?
what is the cutting length of 90 degree bend in four corner ring in column of 8mm dia size of column 450mmx250mm of clear cover 20mm?
13 Answers Abhiram Infra Projects, Al-Darwish, Sobha Developers,