Question 36 - For a mixture of benzene (B), toluene (T) and xylene (X), the equation applies where x for B, T and X will sum up to 1. The equation of x for each component is x = (L / V + 1) (F) / (L / V + K). The data of F for each component are : 0.5 for B, 0.35 for T, 0.15 for X. The data of K for each component are : 1.98 for B, 0.76 for T, 0.24 for X. When x for B + x for T + x for X = 1, find the values of (a) L / V; (b) x for each component of B, T, X respectively. You may use Excel program - Data : What-If-Analysis for Goal Seek to perform the iterative calculations.
Answer / kang chuen tat (malaysia - pen
Answer 36 - By using Excel program, L / V = 0.654. The data of x are : 0.31 for B, 0.41 for T, 0.28 for X. You may bring your own calculator on laptop or phone with Excel program to assist the trial and error. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.
| Is This Answer Correct ? | 0 Yes | 0 No |
What diffrence between flush distillation & batch distillation ?
ENGINEERING MATHEMATICS - EXAMPLE 8.1 : A local utility burns coal having the following composition on a dry basis : Carbon (C) 83.05 %, hydrogen (H) 4.45 %, oxygen (O) 3.36 %, nitrogen (N) 1.08 %, sulfur (S) 0.7 % and ash 7.36 %. Calculate the ash free composition of the coal with reference to C, H, O, N and S.
NATURAL GAS ENGINEERING - QUESTION 26.1 : (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.
How much water is lost through a commercial cooling tower system with a throughput of about 600 gpm?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.12 : You, as an engineer, buy a piece of biochemical instrument to start a servicing business. The instrument has a useful life of 3 years, that costs $60k. The instrumental business generates $100k per year. The labor costs $50k per year. The $60k new instrument depreciates in its value evenly up to 3 years, thereafter the old instrument needs to be replaced by another piece of new instrument. (i) In the first year of this engineering business : (a) what is its starting cash? (b) calculate the depreciation value of the instrument. (c) find the operating profit generated. (d) what is the capital expense of the business? (e) calculate the cash from operation. (f) calculate the ending cash. (ii) Based on the income statement of the business in the second year : (a) find the capital expense of the business. (b) what is its starting cash? (c) calculate the depreciation value of the instrument. (d) find the operating profit generated. (e) calculate the cash from operation. (f) calculate the ending cash.
what is difference between open loop system & close loop system by overview.
any meter avilable for measureing the Transformer Losses. ( like Voltmeter for voltage & ammiter for currenr )if yes plz give the make & supplier address, Email, Phone number.
What compounds are responsible for the odors that come from wastewater treatment plants?
Question 103 - (a) Let | - > = 1 | x > + 0 | y >, | | > = 0 | x > + 1 | y >. Find the value of 2 | x > + 3 | y > in term of | - > and | | >. (b) Let m to be the reduced mass. Find the value of m in term of Ma and Mb where 1 / m = 1 / Ma + 1 / Mb.
What is the method of determining maximum differential pressure during hydro testing of shell and tube heat exchangers?
Why is steam added into the cracker in thermal cracking?
ENVIRONMENTAL ENGINEERING - QUESTION 22.3 : A well delivers 225 US-gallons per minute of water to a chemical plant during normal system operation. (a) Calculate its flowrate in the unit of mega US-gallon per day or MGD. (b) The following formula is written next to the chlorine feed point : (chlorine feed rate, lb / day) = (flowrate, MGD) X (dose, mg / L) x (8.34). If this formula is correct, then what should the chlorine feed rate to be in pounds per day (lb / day) if the desired dose is 2 mg / L. (c) Prove by calculations that the constant 8.34 in the formula next to the chlorine feed point is correct. Let 1 US-gallon = 3.78541 L and 1 mg = 0.0000022046 pound.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)