Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
No Answer is Posted For this Question
Be the First to Post Answer
what is mix design of sand cement and and aggrigate of M10 M20 M25..
WHAT IS FLOOR AREA RATIO? Y IS IT NECESSARY? HOW TO CALCULATE IT?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
In which grade of steel the laping length required is more,Fe 415 or Fe 500 ? and why?
How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
m20 grate concret mix,if sand&agregate take by wights for 1 bag cement so how much any formula?
what is the minium content of cementous material per cu meter
what are the five benefits of using standard terminology in the measurement process?
how many nails in 1 sq mitar
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
what qualifications did you need to become a civil engineer?
what is mant by point of conter of fracher(p.c.f)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)