in 33kv/11kv stepdown t/f why should we use Star point
Answers were Sorted based on User's Feedback
Answer / .edmk
Since, 11kv voltage can be distributed for industries,hospitals and some schools, it is easier if we hav star connected secondary.
Since,in star connection we can distribute a phase line with the neutral.
Hope i cleared your doubt
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / prajesh gajjar
whenever distribution line is concerned, we have to used delta/star transformer to fullfill the requirement of customer .
| Is This Answer Correct ? | 2 Yes | 0 No |
What is different between DOL(Direct on line starter), VSD, S/S(Soft starter), and A/T(Auto Transformer)
i want to syncronise 5 nos of DG. How? pls reply
How to maintain ac plant?
Dear Sir / Madam, Actually we requied 64 A MCB, But i have 32 A MCB = 2 No's this two i have to make series connection and we usw any place? isit possible or not......
4 Answers Hindustan Unilever Limited,
What is meant by full pitched winding?
the site measured knee point voltage of protection class CTs should be greater than rated knee point voltage? what about meetering class CTs. Should it be below the rated knee point voltage?
How to calculate voltage drop loss in HT 11000 Volts XLPE Aluminium conductor cable. Any specific formula or Thumb rule
Operation carried out in thermal power stations?
what is sustainable current of any conductors . a bare busbar or pvc cable has different sustainable current .
We have studied about many techniques for finding the stability of system, ROOT LOCUS, ROUTH, BODE PLOT, POLER PLOT etc. In these which is used where. what are the difference among them... PLZ tell me.......
How to calculate & connection of 900KVA generator 2 sets & load(1500A)? How to choose cable size and ACB size for this load & generator? please explain me detail. Regards, Mr.Han
We are planning to synchronized DG's with our captive plant in the event of black start of plant, but before sync we checked voltage of DG with our plant voltage and it varies from 5 V to 450 V. So in this condition how we can sync DG with plant ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)