in 33kv/11kv stepdown t/f why should we use Star point
Answer Posted / .edmk
Since, 11kv voltage can be distributed for industries,hospitals and some schools, it is easier if we hav star connected secondary.
Since,in star connection we can distribute a phase line with the neutral.
Hope i cleared your doubt
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
can any one provide me a connection wiring diagram for a DG set control panel along with BOM?
what is the voltage rating of chiller unit sensors
what is inter connected dc generator?
what exactly commisioning work does in electrical site work... LT side?..
what is the diference between the 4pole & 6pole DC Motors & what is advantage 6pole over the 4pole ?
What is the permissable nutral current of three phase system as per IS standards?
What is meant by time harmonics and space harmonics?
Explain with example of functional requirements of protection relay in terms reliability, selectivity, sensitivity
Why reactive power is needed in a power system? How is it being absorbed or delivered by alternators? For reactive power control we are changing excitation but reactive power absorbing or delivering related to stator. How these two are interlinked? i want a detailed explanation with necessary expressions and figures?
how we arrange the hv side with delta connection in case 33/11kv of transformer.
can we start slipring motor on star delta like we start induction motor ? if yes where will we connect ?
How many double suspension hardware fittings are required on a double circuit transmission tower?
Define conversion efficiency of a power amplifier. What is its value for class c power amplifier?
How Can I calculate for the photometrics requirements for a street lighting? Data given are: 45 units of 6 meter light pole with 150 watts metal halide lamp, 220 volts and installed in a promenade area.
1)how to reduce the value of tan delta of trasformer and CB,bushing,CT&PT,CVT ? 2)how to reduce the resistance of CB contact and its operating time? 3)plz.....send me the project report on conditioning and monitoring of substation equipment on my email id (gusaiyogendra03@gmail.com)